Does Solar Net Metering Transfer When You Sell an Encinitas Home?

Nick Wright  |  November 26, 2026

Usually yes for older systems. If your owned solar was approved under SDG&E's NEM 1.0 or NEM 2.0 tariff, the tariff says it keeps its 20 year legacy period when ownership changes, as long as the panels stay in place. Newer Solar Billing Plan systems differ, because that nine year lock follows the original customer. [1][2][3]

Utility tariffs and community choice energy rules change. Confirm your system's billing status and the transfer steps with SDG&E and San Diego Community Power before you list or promise anything to a buyer.

Which Encinitas Solar Systems Keep Net Metering After a Sale?

It depends on when the system was interconnected. Systems that applied before April 15, 2023 are on NEM 1.0 or NEM 2.0, and both SDG&E tariffs say a facility does not lose its 20 year eligibility when it moves to a new owner or account at the original location. Systems that applied later use the Solar Billing Plan. [1][2][3]

The 20 year clock does not restart at closing. SDG&E measures it from the date on the original Authorization to Operate letter, and the period ends at the annual true up that follows the 20 year mark. A buyer inherits only the time that remains, so a system interconnected in 2016 would reach that point around 2036. [1]

Changes to the system matter too. Under SDG&E's NEM 2.0 tariff, a system keeps its legacy status after repairs or additions only if they do not increase capacity by more than the greater of 10 percent of the original nameplate rating or 1 kW. A buyer who plans to add panels should check that limit first. [2]

The Solar Billing Plan works differently. The CPUC and San Diego Community Power both describe its nine year legacy period as belonging to the customer who caused the system to be installed. A buyer who takes over the system generally does not get a new or continued legacy period, with narrow exceptions such as a spouse or domestic partner, or the buyer of a newly built home. [3][5]

Encinitas Solar Billing Status at a Glance

System status

What happens at a sale

What to gather

NEM 1.0 (SDG&E Schedule NEM), available until SDG&E reached its program limit, no later than July 1, 2017

The 20 year legacy period stays with the system at its original location [1]

Authorization to Operate letter and the tariff shown on recent bills

NEM 2.0 (SDG&E Schedule NEM-ST), applied before April 15, 2023

The 20 year legacy period stays with the system; additions above 10 percent or 1 kW can change that [2]

Authorization to Operate letter and permits for any added panels or batteries

Solar Billing Plan (net billing), applied on or after April 15, 2023

The nine year lock stays with the original customer; a typical buyer does not inherit it [3][5]

Permission to Operate date and recent bills, with no savings promises

Leased system or power purchase agreement

The provider contract controls the equipment transfer; billing status is a separate question

The contract and the provider's written transfer instructions

How Does San Diego Community Power Affect an Encinitas Solar Sale?

Encinitas homes get electricity generation from San Diego Community Power by default, while SDG&E still delivers power and manages service. Solar customers who started before April 15, 2023 moved into the agency's own NEM program, which runs 20 years from the original SDG&E Permission to Operate date. Closing the account triggers a true up. [4][6][7]

According to San Diego Community Power's move in notice for Encinitas, accounts within the City of Encinitas are automatically enrolled in its Power100 service unless the customer opts out or chooses another plan. A buyer moving in will typically be enrolled the same way, which is worth mentioning so the first bill is not a surprise. [7]

The agency's NEM tariff, approved September 25, 2025, says customers who close their electric account before the end of their relevant period are trued up under its rules, and eligible credits are paid within 60 to 90 days after final billing. Its credits offset only its own generation charges, not SDG&E delivery charges. [4][6]

SDG&E delivery charges follow SDG&E's own tariff. Ask SDG&E how your final bill will settle when you close the account, because we did not verify the exact closing steps on the delivery side (unverified). Ordinances and policies often change, so buyers and sellers should confirm the current local rule.

What Should Encinitas Sellers Prepare Before Listing a Solar Home?

Build a short solar file before the home goes live. Gather the Authorization to Operate or Permission to Operate letter, the tariff shown on recent bills, ownership records, warranties, permits and a year of bills. That file lets a buyer verify billing status directly with the providers instead of relying on a savings estimate. [1][2][6]

Describe the system plainly in marketing: owned or leased, the billing plan it is on and roughly when that plan's legacy period ends. Avoid quoting future savings, because rates, usage and the buyer's own enrollment choices will differ. Our guide to selling a North County home with a solar lease covers lease and power purchase agreement transfers.

Solar is one piece of listing prep. Our Encinitas pre-listing coastal permit guide and our guide to preparing an Encinitas home for sale cover the broader checklist. If you hire an agent to help, commissions are always negotiable between consumers and brokers.

Encinitas Solar Seller Checklist

  • Find the Authorization to Operate or Permission to Operate letter and note its date
  • Confirm on a recent bill whether the system is on NEM 1.0, NEM 2.0 or the Solar Billing Plan
  • Gather permits for any added panels or batteries and compare capacity to the original rating
  • Collect 12 months of bills, equipment warranties and the installer's contact details
  • If the system is leased or under a power purchase agreement, request the provider's transfer packet early
  • Plan to close your electric account at closing and watch for the San Diego Community Power true up

Frequently Asked Questions

These five answers cover the solar billing questions Encinitas sellers ask most before listing. They reflect utility and agency tariffs as published, which can change, so confirm details for your account. Sources were reviewed November 26, 2026 PST.

Does my NEM 2.0 status reset to 20 years for the buyer?

No. The legacy period runs from the original Authorization to Operate date, so the buyer inherits only the years that remain on the system's term. [1][2]

Does the Solar Billing Plan nine year lock transfer to a buyer?

Generally no. The CPUC and San Diego Community Power tie that legacy period to the customer who caused the system to be installed, with narrow exceptions such as a spouse or domestic partner. [3][5]

Can the buyer add panels and keep NEM 2.0?

Only within limits. SDG&E's NEM 2.0 tariff keeps legacy status if additions do not raise capacity by more than the greater of 10 percent of the original rating or 1 kW. [2]

What happens to my San Diego Community Power credits when I sell?

When you close the account, the agency trues it up under its NEM tariff and pays eligible credits within 60 to 90 days after final billing. [4]

Is every Encinitas home enrolled in San Diego Community Power?

Encinitas accounts are automatically enrolled in Power100 unless the customer opts out or picks another plan, according to the agency's Encinitas move in notice. [7]

Sources

These primary sources support the tariff, legacy period and community choice energy statements in this guide. Each entry shows its date or effective date, along with the date we reviewed it. Tariffs change, so confirm current versions with each provider.

  1. SDG&E Schedule NEM (NEM 1.0) tariff, Special Condition 7, Transition Process. Transition sheets effective February 22, 2017 (Advice Letter 2993-E); read November 26, 2026 PST.
  2. SDG&E Schedule NEM-ST (NEM 2.0) tariff, Special Condition 10, Grandfathering Provisions. Grandfathering sheets effective February 22, 2017 (Advice Letter 2993-E); read November 26, 2026 PST.
  3. California Public Utilities Commission, Net Energy Metering and Net Billing. Web page, undated; read November 26, 2026 PST.
  4. San Diego Community Power, Net Energy Metering Tariff (Board policy). Approved September 25, 2025, Resolution No. 2025-15; read November 26, 2026 PST.
  5. San Diego Community Power, Net Billing Tariff (Board policy). Approved September 25, 2025, Resolution No. 2025-15; read November 26, 2026 PST.
  6. San Diego Community Power, Net Energy Metering page. Page modified November 6, 2026; read November 26, 2026 PST.
  7. San Diego Community Power, Encinitas move in notice. 2025 mailer, file posted February 2026; read November 26, 2026 PST.

This article is general information, not legal, tax or energy advice. Confirm your system's billing status, transfer steps and contract terms with SDG&E, San Diego Community Power, your solar provider and your own advisors.