Do You Need Design Review to Remodel a Del Mar Home?

Nick Wright  |  November 26, 2026

Usually yes, if the work changes the outside. Del Mar's Design Review Ordinance requires a permit to construct, alter or remodel the exterior of a structure, and no building permit is issued until that permit is approved. Like for like repairs are generally exempt, minor projects get staff review and larger ones go to a public hearing. [1][2][3]

Del Mar's design review rules, guidelines and fees can change. Confirm the current requirements for a specific property with the Del Mar Planning and Community Development Department before you rely on a remodel plan.

What Exterior Work Triggers Design Review in Del Mar?

Most exterior changes do. Under Chapter 23.08 of the Del Mar Municipal Code, a Design Review Permit is required to construct, relocate, alter, remodel or otherwise modify the exterior of any structure. Repair or reconstruction that keeps the existing outer dimensions and surface relationships is generally exempt, and planning staff decide whether a project qualifies. [1][2][3]

There are refinements. In commercial zones and certain overlay zones, like for like work still needs review if it changes exterior design features, materials or colors. Adding a window or door where none exists requires a permit, while a replacement generally does not if it stays within about 10 percent of the original size and in the same location. [1]

Interior only remodels are not exterior modifications, but they may still need building permits. The city notes that Del Mar requires building permits for some work other cities may exempt, such as all new fences, retaining walls and freestanding masonry walls. [2][3]

Del Mar Design Review Paths Compared

Path

Typical projects

How it is decided

Exempt

Repair, restoration or reconstruction that keeps outer dimensions and surface relationships, often called like for like [2]

Planning staff confirm the exemption [2]

Administrative Design Review (ADR)

Pools and spas, new or enlarged windows and doors, fences up to 6 feet, retaining walls up to 4 feet, small structures, awnings and roof height increases of up to 8 inches [2]

Planning Director decides after a 10 business day notice to owners within 300 feet; a timely written objection sends it to the Board [2]

Design Review Board (DRB) permit

Projects that are neither minor nor exempt [3]

Noticed public hearing, typically on the fourth Wednesday of the month, followed by a 10 business day appeal period [3]

How Long Does Del Mar Design Review Take?

It depends on the path. The city's ADR guide says a minor project is generally decided within about one month of a complete application, after a 10 business day neighbor notice. A Design Review Board project goes on the next available monthly agenda once complete, then a 10 business day appeal period before the permit is valid. [2][3]

Board projects can add steps. Some require a Citizens' Participation Program with neighbors before filing, and some require story poles installed 15 days before the hearing and certified by a licensed land surveyor or civil engineer 10 days before it. The Board can also continue an item to a later meeting, with an added fee. [3]

Design approval is followed by building plan check. Del Mar contracts with True North Compliance for building services, and building permits are released only after planning staff confirm the plans match the approval and its conditions. Projects that also need a floodplain permit or a variance generally must obtain those approvals before the Board hears them. [3]

Design Review permits are generally valid for three years from approval unless the resolution says otherwise. If a seller already holds an approval, check its expiration date, and confirm with planning staff whether a new owner can rely on it (unverified). [3] Ordinances and policies often change, so buyers and sellers should confirm the current local rule.

What Should Buyers Check Before Buying a Del Mar Home to Remodel?

Check during escrow, not after closing. Ask the seller for any past or pending design review approvals and conditions, confirm the zoning and any overlay zones for the parcel, and request a pre application conference with the Planning Department to test your remodel idea. Those steps show whether your plan fits the contingency periods in your offer. [2][3]

The Design Review Board considers placement and size, materials and colors, landscaping for new structures and compatibility with surrounding properties. The city's resident handbook lists privacy, bulk and scale, view obstruction and neighborhood compatibility among the areas the regulatory conclusions address, so plans that add height or mass near neighbors deserve extra study. [3][4]

The same handbook notes that the Board can act on related permits with a project, such as a Coastal Development Permit, a Land Conservation Permit for grading and a Tree Removal Permit. Setbacks, lot coverage, floor area ratio and height limits come from the zoning ordinance. [4]

For related reading, our guides to the La Jolla 30 foot height limit and buying a bluff top home in Del Mar or Solana Beach cover rebuild questions, and our Del Mar property tax guide helps with carrying costs.

Del Mar Remodel Due Diligence Checklist

  • Ask the seller for past design review approvals, conditions and any pending applications
  • Confirm the zoning and any overlay zones for the parcel with the Planning Department
  • Book a pre application conference to test your remodel concept
  • Note whether your plan likely fits the exempt, ADR or Design Review Board path
  • Allow time for neighbor notice, a possible hearing, the appeal period and building plan check
  • Check whether any existing approval is close to its expiration date
  • Compare that timeline with the contingency periods in your offer

Frequently Asked Questions

These five answers cover the design review questions Del Mar buyers ask most before they plan a remodel. They reflect city code and guides as published, which can change, so confirm details with the city. Sources were reviewed November 26, 2026 PST.

Can I replace windows in a Del Mar home without design review?

Generally yes if the replacement stays within about 10 percent of the original size and in the same plane and location, except in certain zones where changes to design features, materials or colors need review. [1]

What is Administrative Design Review in Del Mar?

It is a staff level permit for minor projects. The Planning Director decides after a 10 business day neighbor notice, unless a timely written objection sends the project to the Design Review Board. [2]

How often does the Del Mar Design Review Board meet?

The city's applicant guides say the Board typically meets once a month, on the fourth Wednesday. [2][3]

How long is a Del Mar design review approval valid?

Unless the approval says otherwise, Design Review permits are valid for three years from approval and become void if not exercised and vested within that time. [3]

Do I need design review to remodel only the interior?

The ordinance covers exterior modifications, so interior only work generally does not need a Design Review Permit, though building permits may still apply. Confirm with the city. [1][3]

Sources

These primary sources support the permit requirement, review paths, timing and validity statements in this guide. Each entry shows its date or ordinance history, along with the date we reviewed it. City rules change, so confirm current versions with Del Mar.

  1. Del Mar Municipal Code Chapter 23.08, Design Review, Sections 23.08.020 and 23.08.030 (Municode). Section 23.08.030 history: Ord. No. 565; Ord. No. 784; read November 26, 2026 PST.
  2. City of Del Mar, Administrative Design Review (ADR): An Applicant's Guide to the Process. Updated April 2024; read November 26, 2026 PST.
  3. City of Del Mar, Design Review Permit (DRB): An Applicant's Guide to the Process. Updated April 1, 2019; read November 26, 2026 PST.
  4. City of Del Mar, Neighbor Handbook: Understanding the Design Review Process. Dated July 19, 2016; read November 26, 2026 PST.

This article is general information, not legal or design advice. Confirm the permits, timelines and standards that apply to a specific Del Mar property with the city and your own architect or attorney before you rely on them.